Argentina · Mining · 2024–2025
Evaporation ponds for a lithium project
Liex (Zijin) · 3Q Project, Catamarca, Argentina
Geomembrane installation in evaporation ponds in the Puna.
Areas are approximate.

Uruguay · Biogas and effluents · 2015
JBS · Canelones, Uruguay
≈ 20,000 m² of HDPE/LLDPE geomembrane and floating cover, in 90 days.
View project
Uruguay · Biogas and effluents · 2018
Conaprole · Villa Rodríguez, San José, Uruguay
HDPE geomembrane in a covered digester and treatment lagoons.
View project
Argentina · Mining · 2008–2021
Barrick · Veladero Mine, San Juan, Argentina
≈ 1.35 million m² in the 2017 and 2020 stages, at more than 4,000 m above sea level.
View project
Argentina · Mining · 2020
Lithium projects · Salar del Hombre Muerto, Argentina
≈ 600,000 m² of LLDPE geomembrane on two work fronts.
View project
Argentina · Canals and irrigation · 2015
Vialagro · Cinco Saltos, Río Negro, Argentina
≈ 75,000 m² of HDPE geomembrane along a stretch of about 2 km.
View project
Argentina · Sanitation · 2010
DPA Río Negro · Cipolletti, Río Negro, Argentina
≈ 30,000 m² of floating cover over an anaerobic lagoon.
View project
Argentina · Industry · 2018
Nestlé · Magdalena, Buenos Aires, Argentina
HDPE geomembrane lining of a cracked ditch, in 45 days.
View project
Argentina · Biogas and effluents · 2000–2001
McCain · Balcarce, Buenos Aires, Argentina
≈ 10,000 m² of geomembrane in the reactor and floating cover.
View project
Peru · Mining · 2006–2007
Barrick · Pierina Mine, Áncash, Peru
≈ 400,000 m² of 2 mm LLDPE geomembrane, in 300 days.
View project
Argentina · Mining · 2024–2025
Liex (Zijin) · 3Q Project, Catamarca, Argentina
Geomembrane installation in evaporation ponds in the Puna.

Argentina · Mining · 2021
Livent · Salar del Hombre Muerto, Catamarca, Argentina
Inspection of lined ponds using the electrical method.

Argentina · Sanitary landfills · 2018–2019
Qualitas · Campana, Buenos Aires, Argentina
Barrier system with HDPE geomembrane.

Argentina · Sanitary landfills · 2018
Grupo PI · Bahía Blanca, Buenos Aires, Argentina
New cell between existing cells, with membrane tie-ins, in 12 days.

Argentina · Mining · 2018
Yamana Gold · Gualcamayo Mine, San Juan, Argentina
≈ 1,500 m² of chemical-resistant polyurea, in 20 days.

Argentina · Biogas and effluents · 2018
Salentein · Entre Ríos, Argentina
Geomembrane lining and an aeration system.

Argentina · Biogas and effluents · 2009
Citrusvil · Cevil Pozo, Tucumán, Argentina
Lining and floating cover for a citrus processing plant.

Argentina · Industry · 2001
Profertil · Bahía Blanca, Buenos Aires, Argentina
≈ 15,000 m² over a reservoir in the petrochemical complex.

Argentina · Industry
Petrochemical complex · Bahía Blanca, Buenos Aires, Argentina
Lining of a conveyance channel inside the petrochemical complex.
Technical inquiry