Veladero heap leach pad expansion with geotextile and geomembrane being installed, 2020

San Juan, Argentina · Gold mining

Veladero heap leach pad expansions

+4,000 m

above sea level

≈ 1.35 M m²

in the 2017 and 2020 stages

2008–2021

successive projects

Project data

Client
Barrick
Location
Veladero Mine, Iglesia, San Juan, Argentina
Carried out by
SIGSA S.A. (headquarters, Argentina)
Years
2008 to 2021, in several stages
Area (approx.)
750,000 m² (2017) and 600,000 m² (2020)
Duration
About 300 days per stage
Material
2 mm geomembrane, geotextile and HDPE pipe
Scope
Supply and installation of the liner for heap leach pad expansions
Products and services
Lining · Drainage and filtration · HDPE pipes · Installation and quality control

The project

Lining at more than 4,000 meters

01

Context

Veladero is an open-pit gold mine in the San Juan Andes. The ore is processed by heap leaching on a lined pad that is expanded in stages.

02

Challenge

Tie each new phase into the existing liner, work on steep slopes and keep up the pace at altitude, with wind, extreme cold and short work windows.

03

Solution

2 mm geomembrane over geotextile, tie-in welds with previous phases and HDPE pipes for the collection system, with every weld tested.

04

Result

SIGSA has supported the pad expansions since 2008, with documented quality control at every stage.

Gallery

The project in pictures

Works on the Veladero heap leach pad, 2008
01 · 2008 works
Aerial view of the heap leach pad and the mine area, 2020
02 · Aerial view of the pad, 2020
Crew installing geomembrane at dawn, 2020
03 · Installation crew, 2020
Geotextile deployed on the slope, 2021
04 · Deployment on the slope, 2021
Technicians extrusion welding geomembrane, 2021
05 · Extrusion welding, 2021
Liner progress on the hillside, 2021
06 · Liner progress, 2021

More projects

Related projects

View all projects
Pierina heap leach pad lined with geomembrane
01

Peru · Mining · 2006–2007

Heap leach pad expansion, phase 5

Barrick · Pierina Mine, Áncash, Peru

≈ 400,000 m² of 2 mm LLDPE geomembrane, in 300 days.

View project
Aerial view of lined evaporation ponds at Salar del Hombre Muerto
02

Argentina · Mining · 2020

Evaporation ponds for lithium pilot plants

Lithium projects · Salar del Hombre Muerto, Argentina

≈ 600,000 m² of LLDPE geomembrane on two work fronts.

View project
Lined Cinco Saltos canal in service
03

Argentina · Canals and irrigation · 2015

Lining of an irrigation and drinking water canal

Vialagro · Cinco Saltos, Río Negro, Argentina

≈ 75,000 m² of HDPE geomembrane along a stretch of about 2 km.

View project