The project
Veladero is an open-pit gold mine in the San Juan Andes. The ore is processed by heap leaching on a lined pad that is expanded in stages.
Tie each new phase into the existing liner, work on steep slopes and keep up the pace at altitude, with wind, extreme cold and short work windows.
2 mm geomembrane over geotextile, tie-in welds with previous phases and HDPE pipes for the collection system, with every weld tested.
SIGSA has supported the pad expansions since 2008, with documented quality control at every stage.
Gallery






More projects

Peru · Mining · 2006–2007
Barrick · Pierina Mine, Áncash, Peru
≈ 400,000 m² of 2 mm LLDPE geomembrane, in 300 days.
View project
Argentina · Mining · 2020
Lithium projects · Salar del Hombre Muerto, Argentina
≈ 600,000 m² of LLDPE geomembrane on two work fronts.
View project
Argentina · Canals and irrigation · 2015
Vialagro · Cinco Saltos, Río Negro, Argentina
≈ 75,000 m² of HDPE geomembrane along a stretch of about 2 km.