The project
Nestlé's Magdalena plant produces soluble coffee and treats its high organic load effluents in a concrete oxidation ditch.
Over the years the walls cracked and the effluent began to leak, with a risk of contaminating the soil.
Internal lining of the ditch with HDPE geomembrane, welded and fixed to the existing structure, without having to demolish it.
Ditch watertight and back in service after 45 days of work.
Gallery





More projects

Uruguay · Biogas and effluents · 2015
JBS · Canelones, Uruguay
≈ 20,000 m² of HDPE/LLDPE geomembrane and floating cover, in 90 days.
View project
Argentina · Sanitation · 2010
DPA Río Negro · Cipolletti, Río Negro, Argentina
≈ 30,000 m² of floating cover over an anaerobic lagoon.
View project
Argentina · Biogas and effluents · 2000–2001
McCain · Balcarce, Buenos Aires, Argentina
≈ 10,000 m² of geomembrane in the reactor and floating cover.
View projectIndustry