The project
The Cipolletti sewage plant combines a high-load anaerobic primary lagoon with aerated and facultative lagoons in series.
The anaerobic process releases methane and hydrogen sulfide, which caused bad odors in the area.
Geomembrane floating cover over the anaerobic lagoon, with ballast, rainwater channels and a gas capture and conveyance system.
Odor and emission control: the gases are captured instead of being released into the atmosphere.
Gallery






More projects

Uruguay · Biogas and effluents · 2015
JBS · Canelones, Uruguay
≈ 20,000 m² of HDPE/LLDPE geomembrane and floating cover, in 90 days.
View project
Argentina · Biogas and effluents · 2000–2001
McCain · Balcarce, Buenos Aires, Argentina
≈ 10,000 m² of geomembrane in the reactor and floating cover.
View project
Uruguay · Biogas and effluents · 2018
Conaprole · Villa Rodríguez, San José, Uruguay
HDPE geomembrane in a covered digester and treatment lagoons.
View projectSanitation