The project
Lithium in the Puna is obtained by concentrating brine through solar evaporation in large ponds built on the salt flat.
Achieve watertight ponds on saline soils, with large temperature swings, wind and radiation, and deadlines set by the start-up of the pilot plants.
LLDPE geomembrane liner, fusion and extrusion welded, with a tightness test on every seam.
Two pond fronts completed in 75 and 140 days, ready to be filled with brine.
Gallery






More projects

Argentina · Mining · 2008–2021
Barrick · Veladero Mine, San Juan, Argentina
≈ 1.35 million m² in the 2017 and 2020 stages, at more than 4,000 m above sea level.
View project
Peru · Mining · 2006–2007
Barrick · Pierina Mine, Áncash, Peru
≈ 400,000 m² of 2 mm LLDPE geomembrane, in 300 days.
View project
Argentina · Canals and irrigation · 2015
Vialagro · Cinco Saltos, Río Negro, Argentina
≈ 75,000 m² of HDPE geomembrane along a stretch of about 2 km.
View projectMining