
Double-track thermal fusion between geomembrane panels, with automatic equipment. The air channel between the two tracks allows the seam to be air pressure tested.
Ask for the data sheet and availability
Welding with added material for details, connections to structures, patches and repairs.
Ask for the data sheet and availability
Weld specimens tested in shear and peel with a field tensiometer, according to the project's quality control plan.
Ask for the data sheet and availability
Pressurization of the channel in double-track welds to check tightness along their entire length.
Ask for the data sheet and availability
Testing of extrusion welds and patches with a vacuum box and soapy solution.
Ask for the data sheet and availability
Electrical method to locate holes over the entire installed surface, even when the geomembrane is covered by water or soil.
Projects with this material: Livent, Salar del Hombre Muerto, Catamarca, Argentina
Ask for the data sheet and availability
Fusion joining of HDPE pipes, up to 1,200 mm in diameter.
Ask for the data sheet and availabilityOn site

Argentina · Mining · 2008–2021
Barrick · Veladero Mine, San Juan, Argentina
≈ 1.35 million m² in the 2017 and 2020 stages, at more than 4,000 m above sea level.
View project
Argentina · Mining · 2020
Lithium projects · Salar del Hombre Muerto, Argentina
≈ 600,000 m² of LLDPE geomembrane on two work fronts.
View project
Peru · Mining · 2006–2007
Barrick · Pierina Mine, Áncash, Peru
≈ 400,000 m² of 2 mm LLDPE geomembrane, in 300 days.
View projectData sheets and availability